Search for

Data | Image Gallery | Eurofighter Typhoon Merchandise

- - - -

Eurofighter Typhoon Eurofighter
Typhoon
Multi-Role Fighter

DESCRIPTION:
The European Fighter Aircraft (EFA) program began in 1983 when France, Germany, Italy, Spain, and the UK agreed to develop a common air superiority fighter for the 21st century. France eventually pulled out of the program, as Germany almost did in 1992. Having survived numerous disagreements over workshares since that time, the effort finally culminated in the development of the Eurofighter 2000. Built jointly by British Aerospace (now BAE Systems), DASA, CASA, and Alenia, the aircraft was later rechristened simply as the Eurofighter. The plane has also been dubbed the Typhoon primarily for the export market.

The Typhoon is optimized for the air defense mission but maintains a secondary ground attack capability. With its powerful advanced engines and canards, the aircraft is highly manueverable and capable of short takeoffs and landings. Despite significant delays due to escalating costs and political problems, the prototype EF2000 first flew in March 1994 and began entering service in 2003.

Construction of the Typhoon has been divided over three major production runs known as tranches. Each tranche incorporates major changes in the production configuration while adding new capabilities to the aircraft. Further upgrades, primarily in software, are added as blocks or batches. Typhoon Tranch 1 entered production in 2002 with air-to-air capability achieved under Block 2. Full compatability with air-to-ground weapons was implemented in Block 5. Development of Tranche 2 is now underway during which the Block 8 upgrade replaces obsolescent systems to support the integration of future weapons on the Eurofighter.

The most controversial is Tranche 3 originally intended to integrate better engines, conformal fuel tanks, and an active electronically scanned array (AESA) radar. These upgrades have since been significantly scaled back or cancelled outright causing some partners to doubt whether Tranche 3 should be built at all. If development does continue, the final Typhoon tranche should enter production around 2012.

Some 700 total Eurofighter Typhoons are currently planned, including 232 for the UK, 180 for Germany, 121 for Italy, and 87 for Spain. Austria has placed an order for 15 and Saudi Arabia is due to receive 72, but an order from Greece for 60 Typhoons was cancelled in 2004. About 157 of the planned production run are to be Tranche 1 models while 284 are Tranche 2 and 260 are Tranche 3. Unfortunately, rising costs and involvement in the F-35 program have led both the UK and Italy to question their commitments to Tranche 3. Should these nations slash their Typhoon orders, it is possible Tranche 3 may be cancelled causing the cost of Tranche 2 aircraft to skyrocket.

These financial conflicts as well as the inability of the partner nations to agree on specific upgrades in each tranche have also damaged sales prospects to some export customers. The Typhoon has so far been unsuccessful in marketing attempts to Singapore and South Korea, but Japan is interested given America's unwillingness to sell the F-22. The Eurofighter consortium is also actively pursuing sales to other nations in Europe and Asia such as Romania, India, and Pakistan. Offers to Norway and Denmark were also underway until late 2007 when the Eurofighter consortium suspended talks over claims the F-35 was being given unfair advantages in the selection process.

Last modified 15 May 2008

HISTORY:
First Flight 29 March 1994
Service Entry June 2003

CREW:

(fighter) one: pilot
(trainer) two: student pilot, instructor pilot

ESTIMATED COST: $122 million [2007$]

AIRFOIL SECTIONS:
Wing Root unknown
Wing Tip unknown

DIMENSIONS:
Length 52.38 ft (15.96 m)
Wingspan 34.46 ft (10.50 m)
Height 17.33 ft (5.28 m)
Wing Area 551.1 ft² (51.2 m²)
Canard Area

25.83 ft² (2.40 m²)

WEIGHTS:
Empty 22,045 lb (10,000 kg)
Typical Load 32,280 lb (15,550 kg)
Max Takeoff 46,295 lb (21,000 kg)
Fuel Capacity internal: 8,820 lb (4,000 kg)
external: two 395 gal (1,500 L) and one 265 gal (1,000 L) tanks
Max Payload

14,300 lb (6,500 kg)

PROPULSION:
Powerplant two Eurojet EJ2000 afterburning turbofans
Thrust

26,980 lb (120 kN)
40,500 lb (180 kN) with afterburner

PERFORMANCE:
Max Level Speed at altitude: 1,320 mph (2,125 km/h) at 36,090 ft (11,000 m), Mach 2.0
at sea level: unknown
Initial Climb Rate unknown
Service Ceiling unknown
Range typical: 2,000 nm (3,700 km)
ferry: unknown
g-Limits +9.0 / -3.0

ARMAMENT:
Gun one 27-mm Mauser cannon
Stations thirteen external hardpoints
Air-to-Air Missile AIM-9 Sidewinder, AIM-120 AMRAAM, Apside, ASRAAM, IRIS-T, Meteor
Air-to-Surface Missile Storm Shadow, ALARM, Brimstone, Taurus
Bomb 500-kg GP, 1,000-kg GP, GBU-24 LGB, Paveway II/III/IV, BL755 cluster
Other ECM pods, reconnaissance pods

KNOWN VARIANTS:
EAP Experimental Aircraft Program funded by the UK and built by British Aerospace based on its Agile Combat Aircraft (ACA) research, served as testbed for Eurofighter systems
EFA Designation for the original Eurofighter design which was cancelled due to high costs
DA1 to DA7 Development Aircraft prototypes testing numerous engine and avionics configurations
IPA1 to IPA7 Instrumented Production Aircraft built to a production standard configuration to test systems for the Series Production Aircraft
Tranche 1 Initial production version; 157 to be built (Austria: 15, Germany: 44, Italy: 29, Spain: 20, UK: 55)
Block 1 First production version of Tranche 1 providing initial operational capability
Block 2 Software upgrade providing improved air-to-air capability
Block 2B Software upgrade providing full air-to-air capability
Block 5 Software upgrade supporting ground attack duties and achieving full operational capability, older aircraft were retrofitted to this standard
Tranche 2 Second major version now entering production; 284 planned (Germany: 68, Italy: 46, Saudi Arabia: 48, Spain: 33, UK: 89)
Block 8 Upgrade to replace the mission computers required for advanced weapons like Storm Shadow and Meteor while also replacing other obsolescent equipment
Block 10 Upgrade to several avionics systems and adding compatability with new weapons including AMRAAM, IRIS-T, laser-guided bombs and GPS-guided weapons
Block 15 Expected to add compatibility with Storm Shadow, Taurus, Brimstone, and Meteor missiles
Block 20 Future spiral development
Tranche 3 Third major production version that may introduce a new radar; 260 planned (Germany: 68, Italy: 46, Saudi Arabia: 24, Spain: 34, UK: 88)
C.16 Typhoon Spanish designation for the Typhoon
Typhoon T.1
Typhhon T.1A
Two-seat trainers in the RAF, T.1A models use a modified fuel system
Typhoon F.2 Single-seat Tranche 1 fighter model in the RAF
Typhoon F.3 Two-seat Tranche 1 Block 5 or later fighters in the RAF
Typhoon FGR.4

Single-seat Tranche 1 Block 5 or later fighters in the RAF capable of fighter, ground attack, or reconnaissance missions

KNOWN COMBAT RECORD: none

KNOWN OPERATORS: Austria, Östereichische Luftstreitkräfte (Austrian Air Force)
Germany, Deutsche Luftwaffe (German Air Force)
Italy, Aeronautica Militare Italiana (Italian Air Force)
Saudi Arabia, Al Quwwat al Jawwiya al Malakiya as Sa'udiya (Royal Saudi Air Force)
Spain, Ejército del Aire Española (Spanish Air Force)
United Kingdom (Royal Air Force)

3-VIEW SCHEMATIC:

Eurofighter Typhoon


SOURCES:





Back Aircraft | Design | Ask Us | Shop | Search Home
About Us | Contact Us | Copyright © 1997-2008
Search for